Driveway grading & repair

Gravel driveway grading & repair in Columbia, Lawrenceburg & Middle TN

New gravel drives, washouts, ruts and potholes, fixed at the grade and the drainage instead of just topped off with more stone. We are based in Lawrenceburg and work in Lawrence, Maury, Giles and Marshall counties.

Call (931) 458-1500 Get a Free Quote

Finished gravel driveway running straight through the woods, with drainage rock along the edge
A finished gravel drive with drainage stone along the edge

Driveway grading in Lawrenceburg, Columbia and nearby: what is included

Every driveway quote starts with a walk down the lane with you. Depending on what the drive needs, the job includes:

  • Regrade and crown. Cut the high spots, fill the low ones, and shape a crown (or a cross-slope on a hillside lane) so water leaves the surface. We use the Kubota SVL97-2 track loader or the excavator, depending on width and access.
  • Ditches and turnouts. We cut side ditches, build turnouts where the drive crosses a slope, and set a culvert where water has to cross. See driveway culverts & drainage.
  • Base and surface stone. Soft spots get dug out and filled with larger stone, then a surface stone that packs tight. We haul in gravel and fill dirt from local quarries and spread it ourselves, so hauling and labor come in one quote.
  • New drives. We lay out the route, clear it, strip the topsoil, build the subgrade and stone it, with a culvert at the road entrance if the ditch needs one.
  • Edges and outlets. Rip rap goes where a ditch empties or a slope would otherwise erode.

Not included: paving, asphalt or concrete. We build and repair gravel and dirt drives and the grading and drainage under them. If you are also building, the building pad can be done in the same visit.

Our driveway process, step by step

  1. Walk the drive. We look at the slope, the stone that is left, and where water enters and leaves. Phone photos help, but the walk is what the quote is built on.
  2. Free on-site quote. You get what we would do and why, before any machine is unloaded.
  3. Fix the water first. Ditches, turnouts and culverts go in before new stone, so the stone has a chance to stay put.
  4. Regrade and shape. High spots are cut, low spots filled, and the crown is set.
  5. Stone, finish and walk-through. Stone is spread and packed, rip rap goes at the outlets, and we walk the finished drive with you.

Driveway grading photos from our own jobs

The lane before grading, the track loader at work, and finished gravel drives, including our Pulaski job.

Rough, rutted gravel and dirt lane running through the trees before grading
Before: the lane before grading (Pulaski)
Orange Kubota SVL97-2 track loader grading a narrow gravel lane in the woods
The SVL97-2 grading the same lane
Long straight graded gravel drive through woods with rip rap along the edge
After: graded drive with rip rap along the edge
Gravel drive meeting a dirt turnoff, with a pile of rip rap stone beside it
Rip rap staged beside a graded drive (Pulaski)
Wide, flat gravel drive area beside white outbuildings with a track loader in the distance
A wide gravel drive area after grading
Freshly cut dirt lane through the trees with machine track marks, heading toward a house
A new lane cut through the trees

Why driveways around Lawrenceburg and Columbia fail

Most failing driveways are water problems before they are gravel problems. On the Highland Rim around Lawrenceburg and Pulaski, cherty silt loam over clay subsoil sheds water slowly, and a hard rain turns a long, sloped lane into a creek bed. Around Columbia and Lewisburg, limestone-based clay goes slick when wet and holds water in every low spot. Hauling more gravel onto a drive with no crown and no ditch just buries the problem, and the next storm carries the new stone down the hill with the old.

What moves the price

We do not price driveways over the phone, because two drives of the same length can be completely different jobs. What changes the number: length and width; how much existing stone can be reused; steepness and how many places water must cross; soft spots that need dig-out; clearing along the route; culverts, ditches or rip rap; and the haul distance for stone. Quotes are free and on-site.

Timing and permits

Grading saturated clay ruts your yard, so we would rather wait a few dry days. Fall is a good time to fix drainage before the winter rains, and a dry stretch in summer is best for re-stoning. If a washout is cutting into the road or a neighbor's property, tell us when you call. Before building a new drive onto a county or state road, check entrance requirements with the county highway department. We build to what they require; we do not do permitting or engineering.

Frequently asked questions

How much does it cost to regrade a gravel driveway?

It depends on length, width, slope, how much new stone is needed and whether ditches or culverts are part of the fix. We give free on-site quotes instead of guessing over the phone. Call (931) 458-1500 to set up a visit.

Why does my driveway wash out every time it rains?

Usually water is running down the lane instead of off it. With no crown, ditch or culvert, it gathers speed and carries the stone away. The fix is a crown, ditches or turnouts, and a culvert or rip rap where water crosses or exits.

Can you regrade without bringing in new gravel?

Sometimes. If the existing stone is still there, we can often pull it back from the edges, reshape it and recompact. If it is thin or mixed into the mud, new stone is the honest answer.

Do you build brand-new gravel driveways, including clearing the route?

Yes. We clear the path, strip topsoil, build the subgrade, set culverts and spread the stone, all in one quote.

Do you grade driveways in Columbia and Lawrenceburg?

Yes. We are based on Tripp Road in Lawrenceburg and take driveway jobs in Lawrence, Maury, Giles and Marshall counties, including Columbia, Mt. Pleasant, Spring Hill, Pulaski and Lewisburg. Call (931) 458-1500 and we will tell you if your place is in range.

Service area

Driveway grading in Columbia, Lawrenceburg & nearby

We are based on Tripp Road in Lawrenceburg (Lawrence County) and take driveway jobs across Lawrence, Maury, Giles, Marshall, Lewis and Wayne counties. We also serve Williamson County, including Franklin, Brentwood, Nolensville and Thompson's Station. Pick the town closest to you for local detail.

Also driveway work in Waynesboro, Hohenwald, Loretto, Ethridge, Summertown and Leoma, all within the counties above. See Lawrenceburg, Columbia, Spring Hill, Mt. Pleasant, Lewisburg and Pulaski.

Related services

Full list on Services. Job photos on Work. Estimate materials with the gravel & fill dirt calculator.

This goes into our job book. Or call (931) 458-1500.

Free quote

Tell us about your driveway

Send the address and a couple of phone photos, or just call. We will come walk the drive and give you a free on-site quote.

Phone: (931) 458-1500

Address: 355 Tripp Road, Lawrenceburg, TN 38464

Hours: Monday–Friday, 8:00 AM – 5:00 PM

Josh & Mark Collier. Licensed and insured. Serving Middle Tennessee.

Call (931) 458-1500