Blog

House Pads for Mobile and Modular Homes: Getting the Ground Ready

A mobile, manufactured or modular home is built in a factory, but it still depends on the ground it sits on. A level, well-drained, properly compacted pad keeps the home stable, keeps water out from underneath and makes setup go smoothly.

We're Josh and Mark Collier with Middle TN Grading & Clearing (MTGC). Here's how we get the ground ready for a factory-built home.

Mobile vs. Modular: Why It Matters for the Pad

  • Manufactured (mobile) homes are usually set on piers, runners or a slab, following the manufacturer's installation instructions.
  • Modular homes are usually set on a site-built foundation, such as a crawlspace, basement or slab, much like a site-built house.

Your home's manufacturer, your installer or builder, and your county or city building department set what the foundation needs. The pad has to be built to match. Check with them before site work starts.

Getting the Site Ready

  1. Choose the spot. Pick high, well-drained ground with room for the home, the driveway and utilities.
  2. Clear the area. Remove trees, brush and stumps from the pad and the delivery route.
  3. Strip topsoil. Organic soil stays soft and shouldn't be under the home.
  4. Level and fill. Cut high spots and fill low ones to make a level pad.
  5. Compact in layers. Fill goes down in lifts and is compacted each time.
  6. Add stone where needed for a firm, well-drained surface.
  7. Grade for drainage. The ground should fall away from the home on all sides.

Drainage Under and Around the Home

Water under a manufactured home causes problems over time, from settling piers to moisture issues. The pad should shed water away from the home, and runoff from uphill should be caught with a swale and sent around it. Downspouts should discharge well away from the pad.

Access for Delivery

Delivering a factory-built home takes room. The route from the road to the pad needs to be wide, firm and clear of low limbs, with enough room to turn. Soft ground can stop a delivery cold. A gravel drive or temporary stone road often solves it. We haul stone, dirt and gravel from the quarry for driveways and delivery routes.

Permits to Check On

Building and placement permits. Check with your county or city about permits, setbacks and inspections for placing a home.

Septic. If the property needs a septic system, check with TDEC or your county about the septic permit before choosing the home site, since the system's location can limit where the home goes.

Driveway onto the road. On a state highway, a TDOT highway entrance permit is required. On a county road, check with the county road department.

Stormwater. Per TDEC, a construction stormwater permit applies to "clearing, grading or excavation that result in an area of disturbance of one or more acres," and to smaller areas that are part of a larger common plan of development or sale.

Call 811 first. Before any digging, contact Tennessee 811 by dialing 811 or going to tenn811.com. Per Tennessee 811, a normal locate request needs at least three working days' notice, not counting weekends and holidays. Calling gets your underground utility lines marked for free.

What Drives the Cost

  • Pad size for the home.
  • Slope and how much cut and fill is needed.
  • Clearing for the pad and delivery route.
  • Fill and stone needed.
  • Driveway and access work.
  • Drainage around the pad.

For your site, call (931) 458-1500 for a free estimate.

When to Call a Pro

We work across Middle TN, and we'll get your site level, firm and draining right before the home arrives.

FAQ

Do I need a concrete slab for a mobile home? Not always. The manufacturer's instructions and your local building department decide what's required.

How level does the pad need to be? Level enough for the installer to set the home to the manufacturer's requirements. Ask your installer.

Can the pad be built on fill? Yes, if the fill is good material compacted in layers.

Should the driveway go in first? Often, yes, so the delivery truck can reach the pad.

You can read more on our house pads page, land clearing page and fill dirt and gravel hauling page.

More on what goes into a house pad, and what drives the cost, is in our post What Does a House Pad Cost?.

If you're getting ready for a new home, call Josh or Mark at MTGC, (931) 458-1500, or request a free quote at middletngrading.com. We're licensed and insured, and we'll come take a look on site and give you an honest answer on what your site needs.

Get a free quote

← Back to the blog

Call (931) 458-1500